wabag
wabag wabag wabag wabag wabag wabag wabag wabag wabag wabag wabag wabag

VA TECH WABAG

CLIENT: ASHGHAL

Installation of Bulk Tanks & Associate piping works, SS pipe routing at digester tank area, Installation of Air blowers, SS pipe routing at diffuser area for Rehabilitation of Doha South Sewage Treatment works (DDSTW)

  • Bulk storage tank installation on the existing foundation with the given nozzle directions and levels includes shifting from store, erection, alignment & grouting.
  • Fabrication and installation of SS pipe DN350 including Tie in connection with existing DN500 SS pipe line
  • Fabrication and installation of SS pipe DN800 including Tie in connection with exiting DN700 SS pipe line
  • Fabrication supply and installation of galvanized steel supports as per the IFC drawings
  • Installation of Air blower
  • Diffuser assembly works in existing and new Aerobic Digesters.