Back to the projects
dfc
dfc dfc dfc dfc dfc dfc dfc dfc dfc dfc dfc dfc

DFC / IKEA

Supply & Installation of TSE Customer line connections works for Doha Festival City and IKEA at Al EBB

  • Liaise with Ashghal Unit for commissioning of the TSE connection including prepare, submit, get approvals of shop drawings, material submittals, RO, TDP, PTW permits.
  • Reinforced concrete in-situ Flowmeter and Gate Valve chambers as per standard drawings, including blinding concrete, protection membrane , paint coating,  Aluminum chamber cover, GRP Ladder, Flow Meter, DI pipes and Fittings, Valves and Fittings, HDPE pipe & Fittings, excavation, disposal , backfilling with compaction.
  • Supply, Installation of RTU panel with Solar Panel  and all approvals from instrumentation and SCADA departments.
  • Tie in connection and Hydro Test.
  •  Test and commissioning.